Assessment of Change Orders Attributes in Preconstruction and Construction Phase
Autor(en): |
Ali Raza Khoso
Jam Shahzaib Khan Rizwan Ullah Faiz Muhammad Akram Akhund |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Civil Engineering Journal, März 2019, n. 3, v. 5 |
Seite(n): | 616 |
DOI: | 10.28991/cej-2019-03091273 |
Abstrakt: |
Construction projects are very complex in nature. Each activity involves multiple varying tasks. Construction industry is the main source of economic growth. When change order occur performance of projects momentously affected. Change orders often have a serious impact on the quality, time and cost. Eventually it results in disputes, delays, and dissatisfactions among stakeholders and ultimately results in failures of projects. In past several studies have been done to evaluate the causes of change order and its effects. Attempts have been made to quantify these impacts by many researchers, but the aim of this study is to identify the causes of change order in two different phases i.e. preconstruction and construction stage. Views were taken from relevant experts over included factors after in-depth literature review from past researches. A questionnaire was made and floated with different construction players from clients, consultants and contractors side. The data was analyzed by SPSS using average index technique. The analysis of data showed that, Mistakes in specifications, Mistakes in design and Lack of experience in selecting construction team by client are the most critical factors during preconstruction phase. Whereas, Design modification by owner, change in scope at later stage and Delays in payment by client are most critical factors of construction phase, responsible for change order. The extensive discussion of these factors revealed various parameters related to Pakistan construction. This study will enable the clients, consultants and contractors to be aware of factors which causes changes in orders and their consequences on project completion. By the identification of possible reasons, the right decisions can be made to mark the project successful. |
Copyright: | © 2019 Ali Raza Khoso, Jam Shahzaib Khan, Rizwan Ullah Faiz, Muhammad Akram Akhund |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |