Asia Transition Box and Conventionally Excavated Twin Tunnels for the Istanbul Strait Road Crossing Project

Autor(en):




Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Geomechanics and Tunnelling, , n. 4, v. 9
Seite(n): 310-316
DOI: 10.1002/geot.201600024
Abstrakt:

The 14.6 km long Istanbul Strait Road Crossing Project is a safe, quick and environmentally responsible alternative road link between Asia and Europe, as such it is being constructed under a Build-Operate-Transfer contract by a public-private partnership. The investor/contractor has committed to build the Project in 55 months and to operate the facility for a concession period of approximately 25 years. This article examines the project's two critical structures located in the Asian side of Istanbul, considering site investigation, construction and monitoring. The first structure is a cut and cover construction next to the Bosphorus, called the Asia Transition Box (ATB), which enabled the launching of the TBM and conventional tunnels. The second is the conventionally excavated twin tunnels (CETT), which pass under a highly urbanized part of Istanbul and provide the transition from the highway into the tunnel under the Bosphorus.

Verfügbar bei: Siehe Verlag

Bauwerke und Projekte

Geografische Orte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/geot.201600024.
  • Über diese
    Datenseite
  • Reference-ID
    10073715
  • Veröffentlicht am:
    02.10.2016
  • Geändert am:
    03.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine