Anatomy of Steel Bridge Heat-Straightening Project
Autor(en): |
R. Richard Avent
Bruce L. Brakke |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Transportation Research Record: Journal of the Transportation Research Board, Januar 1996, n. 1, v. 1561 |
Seite(n): | 26-36 |
DOI: | 10.1177/0361198196156100104 |
Abstrakt: |
Heat-straightening repair of damaged steel girders has been conducted on a number of bridges over the years. However, little documentation is available on repair methodology and response to such repairs. Such documentation for the field repair of a bridge in Iowa is provided. The Iowa Department of Transportation (IDOT) decided to train its maintenance personnel to perform heat-straightening repairs. The training program consisted of 2 days of classroom and laboratory tutorial training and a field heat-straightening project. The field project was a bridge spanning I-80 near Davenport. The repair was successfully completed and demonstrated the practicality of implementing recent advances in heat-straightening research. The response of the damaged girder to the heat-straightening process was also measured and compared with theoretical models. |
- Über diese
Datenseite - Reference-ID
10778572 - Veröffentlicht am:
12.05.2024 - Geändert am:
12.05.2024