Analysis of Construction Settlement of Shield Tunnel Crossing Metro Operating Tunnel

Autor(en):





Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Materials Science and Engineering, , n. 4, v. 782
Seite(n): 042009
DOI: 10.1088/1757-899x/782/4/042009
Abstrakt:

Based on the background of the Suzhou Metro Line 3 crossing the Line 1 operating tunnel, the finite element software MIDAS/GTS was used to perform 3D model and simulate the construction of the shield tunnel. The influence of shield tunnel penetration before and after strengthening on operating tunnels is studied. The research results show that the maximum settlement of the operating tunnel caused by underpass construction without reinforcement is 11.64mm, which exceeds the control value of 10mm, and deformation control measures must be taken. After reinforcement, the maximum settlement of the soil around Line 3 is only 5.65mm, the reduction of settlement about 50%, and the settlement control effect is obvious, which shows that it is feasible to take deformation control measures for pre-reinforcement of the soil around the tunnel.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1757-899x/782/4/042009.
  • Über diese
    Datenseite
  • Reference-ID
    10675260
  • Veröffentlicht am:
    29.05.2022
  • Geändert am:
    29.05.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine