0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Allocating Risks in Public-Private Partnerships Using a Transaction Cost Economic Approach: A Case Study

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Australasian Journal of Construction Economics and Building, , n. 1, v. 9
Seite(n): 19-26
DOI: 10.5130/ajceb.v9i1.3011
Abstrakt:

Public-private partnership (PPP) projects are often characterisedby increased complexity and uncertainty due to their idiosyncrasyin the management and delivery processes such as long-termlifecycle, incomplete contracting, and the multitude of stakeholders.An appropriate risk allocation is particularly crucial to achievingproject success. This paper focuses on the risk allocation in PPPprojects and argues that the transaction cost economics (TCE)theory can integrate the economics part, which is currently missing,into the risk management research. A TCE-based approach isproposed as a logical framework for allocating risks between publicand private sectors in PPP projects. A case study of the SouthernCross Station redevelopment project in Australia is presented toillustrate the approach. The allocation of important risks is putunder scrutiny. Lessons learnt are discussed and alternativemanagement approaches drawing on TCE theory are proposed.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.5130/ajceb.v9i1.3011.
  • Über diese
    Datenseite
  • Reference-ID
    10338690
  • Veröffentlicht am:
    05.08.2019
  • Geändert am:
    05.08.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine