Adaptive Lob Scheduling for Optimizing Resource Leveling and Consumption

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Civil Engineering and Management, , n. 3, v. 30
Seite(n): 220-233
DOI: 10.3846/jcem.2024.20952
Abstrakt:

Several techniques were developed to improve resource allocation in construction projects, yet few in repetitive construction projects. Accordingly, this research aims at minimizing resource consumption and fluctuations using Line-of-Balance (LOB) repetitive scheduling technique. An optimization model has been developed consisting of three modules: LOB schedule module, resource leveling module, and optimization module. The model helps determine the optimum (a) start time for each activity considering any needed delays to level resources, (b) number of crews travelling from one unit to another, (c) unit to change the number of crews, and (d) the new changed number of crews. Unlike the existing efforts, the developed model provides the capabilities of (a) allowing the change of number of crews of an activity at a certain repetitive unit to increase or decrease the progress rate; and (b) accommodates non-serial repetitive projects to enhance the model’s practicality. Using a pipeline project, the model outperformed the existing LOB-based models in minimizing resource consumption and fluctuations within the desired project duration. This study offers the project planners a useful tool to efficiently utilize their projects’ resources and avoid hidden costs due to inefficient resource utilization on-site as well as overcoming shortage in resource availability.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3846/jcem.2024.20952.
  • Über diese
    Datenseite
  • Reference-ID
    10774196
  • Veröffentlicht am:
    29.04.2024
  • Geändert am:
    29.04.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine