Accelerating the middle – rise building construction duration using BIM 4D, a case study in central Jakarta

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 1324
Seite(n): 012022
DOI: 10.1088/1755-1315/1324/1/012022
Abstrakt:

Construction planning involves scheduling and sequencing of project activities for proper execution. Research was conducted to obtain and enhance construction project scheduling, which was good and in accordance with the targets achieved. The results of the project performance analysis in the 9th month using the Earned Value Method resulted in SPI <1 and SV <0, indicating that the project experienced delays. Scheduling using the PDM based on the actual duration of the project shows that the project will be completed in 511 days. The project duration can be accelerated to 429 days by combining overlap and overtime methods. The scheduling results were simulated using BIM 4D to generate a visualization of the scheduling to improve the project monitoring process.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1755-1315/1324/1/012022.
  • Über diese
    Datenseite
  • Reference-ID
    10780167
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine