Junhao Zou
- Using Hue, Saturation, and Value Color Space for Hydraulic Excavator Idle Time Analysis. In: Journal of Computing in Civil Engineering, v. 21, n. 4 (Juli 2007). (2007):
- Quantitative Method for Updating Cost Contingency throughout Project Execution. In: Journal of Construction Engineering and Management, v. 138, n. 6 (Juni 2012). (2012):