- A multiproject scheduling and resource management model in projects construction. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (März 2022). (2022):
- Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. In: Engineering, Construction and Architectural Management, v. 29, n. 2 (Mai 2021). (2021):
- APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. In: Engineering, Construction and Architectural Management, v. 26, n. 6 (Juli 2019). (2019):
- A reconfigurable model for implementation in the closing phase of a wind turbines project construction. In: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020). (2020):
- A heuristic buffer sizing algorithm for implementing a renewable energy project. In: Automation in Construction, v. 117 (September 2020). (2020):