Xueqing Zhou
- A Three-Stage Dynamic Risk Model for Metro Shield Tunnel Construction. In: KSCE Journal of Civil Engineering, v. 28, n. 2 (Dezember 2023). (2023):
- Entity recognition in the field of coal mine construction safety based on a pre-training language model. In: Engineering, Construction and Architectural Management. :