Guangqiang Zhou
- (2024): Multi-Objective Optimization of Tasks Scheduling Problem for Overlapping Multiple Tower Cranes. In: Buildings, v. 14, n. 4 (27 März 2024).
- Experimental and numerical study on seismic behavior of prestressed concrete composite shear wall. In: Engineering Structures, v. 266 (September 2022). (2022):