Yeqin Zhang
- A Risk Assessment Method for Metro Shield Tunnel Construction Based on Interval Number. In: Geotechnical and Geological Engineering, v. 38, n. 5 (27 Mai 2020). (2020):
- Performance-based seismic assessment of shield tunnels by incorporating a nonlinear pseudostatic analysis approach for the soil-tunnel interaction. In: Tunnelling and Underground Space Technology, v. 114 (August 2021). (2021):