- Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: a Canadian study. In: Construction Management and Economics, v. 38, n. 8 (Mai 2019). (2019):
- Analysis of approximations for multinormal integration in system reliability computation. In: Structural Safety, v. 28, n. 4 (September 2006). (2006):
- The influence of temporal uncertainty of deterioration on life-cycle management of structures. In: Structure and Infrastructure Engineering, v. 5, n. 2 (April 2009). (2009):
- Bayesian method for the correlated competitive bidding model. In: Construction Management and Economics, v. 30, n. 6 (Juni 2012). (2012):
- A correlated bidding model for markup size decisions. In: Construction Management and Economics, v. 29, n. 11 (November 2011). (2011):