Z. Yu
- A key technique of construction for Wuxia Yangtze River Bridge. Vorgetragen bei: ARCH’07 – 5th International Conference on Arch Bridges, Madeira, Portugal, 12-14 September 2007. :
- Settlement behaviour of hybrid asphalt-ballast railway tracks. In: Construction and Building Materials, v. 208 (Mai 2019). (2019):
- A Hybrid Method for Estimating Modal Damping in Sag Cable with Oil Damper. In: Advances in Structural Engineering, v. 1, n. 4 (Oktober 1998). (1998):
- Forced vibration studies of sagged cables with oil damper using a hybrid method. In: Engineering Structures, v. 20, n. 8 (August 1998). (1998):
- Experimental Study of Vibration Mitigation of Bridge Stay Cables. In: Journal of Structural Engineering (ASCE), v. 125, n. 9 (September 1999). (1999):
- Vibration of Inclined Sag Cables with Oil Dampers in Cable-Stayed Bridges. In: Journal of Bridge Engineering (ASCE), v. 3, n. 4 (November 1998). (1998):
- Modal analysis of tower-cable system of Tsing Ma long suspension bridge. In: Engineering Structures, v. 19, n. 10 (Oktober 1997). (1997):