Tamotsu Yoshida
- Behavior Of Ground Displacement Due To Shield Thrusting In Alluvial Subsoils And Its Prediction Analysis. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1986, n. 373 (September 1986). (1986):
- Earth Pressure At A Cutting Face And Friction Resistance Between A Shield And Surrounding Subsoils In Case Of Tunnelling By Mud Pressure Balanced Shield. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1992, n. 445 (März 1992). (1992):
- Computational Expression For The Rational Amount Of Backfill Grout Considering The Disturbance Induced By Shield Advancing. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 511 (März 1995). (1995):
- Finite Element Analysis Of General Contact Problems And Application For Excavation Of Shield Tunnel. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1998, n. 603 (September 1998). (1998):