- Determining the Most Economical Work Zone Lengths for Rural Highway Rehabilitation Projects. In: Journal of Management in Engineering (ASCE), v. 39, n. 2 (März 2023). (2023):
- Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times. In: Journal of Management in Engineering (ASCE), v. 38, n. 6 (November 2022). (2022):
- Economical Validation of Residential Solar Power Investment: A Cost–Benefit Analysis Approach. In: Journal of Management in Engineering (ASCE), v. 38, n. 3 (Mai 2022). (2022):
- Alternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance. In: Journal of Management in Engineering (ASCE), v. 37, n. 1 (Januar 2021). (2021):
- ACT 2 : Time–Cost Tradeoffs from Alternative Contracting Methods. In: Journal of Management in Engineering (ASCE), v. 37, n. 1 (Januar 2021). (2021):
- Holistic Performance Evaluation of Highway Design-Build Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (Juli 2020). (2020):