Dong-Jun Yeom
- Development of a Vision-based Machine Guidance System for Hydraulic Excavators. In: Journal of Asian Architecture and Building Engineering, v. 22, n. 3 (Juli 2022). (2022):
- Life cycle cost analysis of a built-in guide-type robot for cleaning the facade of high-rise buildings. In: Journal of Asian Architecture and Building Engineering, v. 21, n. 5 (April 2022). (2022):
- (2021): Final detailed design of an all-in-one attachment-based PHC pile head cutting robot and its structural stability analysis. In: Journal of Asian Architecture and Building Engineering, v. 20, n. 5 (Juli 2021).
- Development of Construction Duration Prediction Model for Project Planning Phase of Mixed-use Buildings. In: Journal of Asian Architecture and Building Engineering, v. 18, n. 6 (November 2019). (2019):
- 3D surround local sensing system H/W for intelligent excavation robot (IES). In: Journal of Asian Architecture and Building Engineering, v. 18, n. 5 (September 2019). (2019):
- Development of all-in-one attachment-based PHC pile head cutting robot. In: Journal of Asian Architecture and Building Engineering, v. 18, n. 6 (November 2019). (2019):
- Development of an Approximate Construction Duration Prediction Model During the Project Planning Phase for General Office Buildings. In: Journal of Civil Engineering and Management, v. 24, n. 3 (Juni 2018). (2018):