Chung-Huei Yang
- Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (Juli 1999). (1999):
- GA-Based Multicriteria Optimal Model for Construction Scheduling. In: Journal of Construction Engineering and Management, v. 125, n. 6 (Dezember 1999). (1999):
- Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. In: Automation in Construction, v. 10, n. 1 (November 2000). (2000):
- A genetic-algorithm-based resource-constrained construction scheduling system. In: Construction Management and Economics, v. 17, n. 6 (November 1999). (1999):
- A fuzzy optimal model for construction resource leveling scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 6 (Dezember 1999). (1999):