Wang‐Ji Yan
- Two‐stage nonparametric framework for missing data imputation, uncertainty quantification, and incorporation in system identification. In: Computer-Aided Civil and Infrastructure Engineering. :
- A statistical influence line identification method using Bayesian regularization and a polynomial interpolating function. In: Structural Control and Health Monitoring, v. 29, n. 11 (September 2022). (2022):