Jiang-Wei Xu
- Stochastic Revenue and Cost Model for Determining a BOT Concession Period under Multiple Project Constraints. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (Mai 2014). (2014):
- Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Autoregression Model. In: Journal of Management in Engineering (ASCE), v. 29, n. 1 (Januar 2013). (2013):
- Determination of the Optimal Concession Period for BOT Contract Projects Based on a Discrete Stochastic Process Model. In: Journal of Construction Engineering and Management, v. 143, n. 4 (April 2017). (2017):