Guoping Xu
- Safety analysis of temporary anchorage system for immersed tube in Shenzhen–Zhongshan Link. In: Journal of Traffic and Transportation Engineering (English Edition), v. 11, n. 4 (August 2024). (2024):
- Multi-point shaking table test for long tunnels subjected to non-uniform seismic loadings - part II: Application to the HZM immersed tunnel. In: Soil Dynamics and Earthquake Engineering, v. 108 (Mai 2018). (2018):
- Compression-shear behavior of a scaled immersion joint with steel shear keys. In: Tunnelling and Underground Space Technology, v. 70 (November 2017). (2017):
- Multi-point shaking table test of a long tunnel subjected to non-uniform seismic loadings. In: Bulletin of Earthquake Engineering, v. 16, n. 2 (September 2017). (2017):
- Advantages and potential challenges of applying semi-rigid elements in an immersed tunnel: A case study of the Hong Kong-Zhuhai-Macao Bridge. In: Tunnelling and Underground Space Technology, v. 79 (September 2018). (2018):
- Another Yangtze Bridge takes shape. In: Bridge Design & Engineering, v. 12, n. 44 (3. Quartal 2006). (2006):