Gangyan Xu
- Multi-agent based safety computational experiment system for shield tunneling projects. In: Engineering, Construction and Architectural Management, v. 27, n. 8 ( 2020). (2020):
- Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong. In: Journal of Management in Engineering (ASCE), v. 35, n. 2 (März 2019). (2019):
- Cloud asset-enabled integrated IoT platform for lean prefabricated construction. In: Automation in Construction, v. 93 (September 2018). (2018):