Xiaoling Wu
- BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule. In: Automation in Construction, v. 130 (Oktober 2021). (2021):
- Thermal and hydraulic analysis on a novel Trombe wall with venetian blind structure. In: Energy and Buildings, v. 123 (Juli 2016). (2016):