Peter Wright
- Assessment of London underground tube tunnels - investigation, monitoring and analysis. In: Smart Structures and Systems, v. 6, n. 3 (April 2010). (2010):
- An observational approach to railway tunnel voids grouting. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 168, n. 3 (Juni 2015). (2015):
- Behaviour of cast-iron tunnel segmental joint from the 3D FE analyses and development of a new bolt-spring model. In: Tunnelling and Underground Space Technology, v. 41 (März 2014). (2014):
- Long-term performance of cast-iron tunnel cross passage in London clay. In: Tunnelling and Underground Space Technology, v. 50 (August 2015). (2015):
- Behaviour of cast-iron bolted tunnels and their modelling. In: Tunnelling and Underground Space Technology, v. 50 (August 2015). (2015):