Ing Liang Wong
- Energy simulations of a transparent‐insulated office façade retrofit in London, UK. In: Smart and Sustainable Built Environment, v. 1, n. 3 (November 2012). (2012):
- Risk management implementation in small and medium enterprises in the UK construction industry. In: Engineering, Construction and Architectural Management, v. 22, n. 1 (Januar 2015). (2015):
- Energy performance evaluation and comparison of sampled Brazilian bank buildings with the existing and proposed energy rating systems. In: Energy and Buildings, v. 225 (Oktober 2020). (2020):
- Classification and energy analysis of bank building stock: A case study in Curitiba, Brazil. In: Journal of Building Engineering, v. 23 (Mai 2019). (2019):
- Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI‐façades. In: Construction Management and Economics, v. 28, n. 7 (Juli 2010). (2010):