Dawid Wisniewski
- (2024): Design and Construction of the Flyover in the Intermodal Ferry Terminal in Świnoujście. Vorgetragen bei: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2024): Design and Construction of an Arch Bridge over Railway Line no. 132 in Poland using BIM Tools. Vorgetragen bei: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- Probability Based Assessment of Serviceability Limit States in Precast Concrete Bridges. Vorgetragen bei: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004. (2004):
- Safety requirements and probabilistic models of resistance in the assessment of existing railway bridges. In: Structure and Infrastructure Engineering, v. 9, n. 6 (Juni 2013). (2013):
- (2016): Safety and Serviceability Assessment of Existing Railway Bridges in Poland. Vorgetragen bei: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Probability-Based Assessment of Existing Concrete Bridges—Stochastic Resistance Models and Applications. In: Structural Engineering International, v. 19, n. 2 (Mai 2009). (2009):
- (2008): Upgrading Existing Railway Bridges in Europe for Higher Speeds and Loads - Assessment Procedures and Requirements. Vorgetragen bei: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- (2008): Probabilistic Shear and Bending Resistance Models for Assessment of Reinforced and Prestressed Concrete Bridges. Vorgetragen bei: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.