Li-zhong Wang
- Undrained Shear Strength of K0 Consolidated Soft Soils. In: International Journal of Geomechanics, v. 8, n. 2 (März 2008). (2008):
- Complex Variable Solutions for Tunneling-Induced Ground Movement. In: International Journal of Geomechanics, v. 9, n. 2 (März 2009). (2009):
- Stress Dilatancy of Natural Soft Clay under an Undrained Creep Condition. In: International Journal of Geomechanics, v. 15, n. 5 (Oktober 2015). (2015):
- Modeling Strain-Rate Dependent Behavior of KR0-Consolidated Soft Clays. In: Journal of Engineering Mechanics (ASCE), v. 138, n. 7 (Juli 2012). (2012):
- Horizontal vibration of a rigid disk buried in a poroelastic half-space in contact with a fluid half-space. In: Soil Dynamics and Earthquake Engineering, v. 44 (Januar 2013). (2013):
- A coupled fluid layer–rigid disk–poroelastic half-space vibration problem. In: Soil Dynamics and Earthquake Engineering, v. 43 (Dezember 2012). (2012):
- Time harmonic point load and dynamic contact problem of contacting fluid and poroelastic half-spaces. In: Soil Dynamics and Earthquake Engineering, v. 36 (Mai 2012). (2012):
- Rocking vibrations of a rigid circular foundation on poroelastic half-space to elastic waves. In: Soil Dynamics and Earthquake Engineering, v. 31, n. 4 (April 2011). (2011):
- Analytical Prediction of Pipeline Behaviors in J-Lay on Plastic Seabed. In: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 138, n. 2 (März 2012). (2012):
- Field monitoring of a subsea shield tunnel during standpipe lifting. In: Tunnelling and Underground Space Technology, v. 45 (Januar 2015). (2015):
- Construction behavior simulation of a hydraulic tunnel during standpipe lifting. In: Tunnelling and Underground Space Technology, v. 26, n. 6 (November 2011). (2011):
- Theoretical assessment of burst failure of internally pressurized defect-free pipelines with plastic anisotropy. In: China Ocean Engineering, v. 27, n. 4 (August 2013). (2013):
- Undrained bearing capacity of spudcan under combined loading. In: China Ocean Engineering, v. 25, n. 1 (März 2011). (2011):
- Case Study of Rehabilitation of a Damaged Underwater Tunnel in the Construction Phase. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 1 (Februar 2016). (2016):