Michael C. Vorster
- Relationship between Personality Traits and Performance for Engineering and Architectural Professionals Providing Design Services. In: Journal of Management in Engineering (ASCE), v. 18, n. 4 (Oktober 2002). (2002):
- Innovations to Manage Disputes: DRB and NEC. In: Journal of Management in Engineering (ASCE), v. 16, n. 5 (September 2000). (2000):
- Model for Retiring, Replacing, or Reassigning construction equipment. In: Journal of Construction Engineering and Management, v. 113, n. 1 (März 1987). (1987):
- Consequential Equipment Costs Associated with Lack of Availability and Downtime. In: Journal of Construction Engineering and Management, v. 116, n. 4 (Dezember 1990). (1990):
- DBE Programs—New Model. In: Journal of Construction Engineering and Management, v. 117, n. 1 (März 1991). (1991):
- Total Float Traded as Commodity. In: Journal of Construction Engineering and Management, v. 117, n. 4 (Dezember 1991). (1991):
- Highway Construction Data Collection and Treatment in Preparation for Statistical Regression Analysis. In: Journal of Construction Engineering and Management, v. 135, n. 12 (Dezember 2009). (2009):
- Statistical Considerations for Predicting Residual Value of Heavy Equipment. In: Journal of Construction Engineering and Management, v. 132, n. 7 (Juli 2006). (2006):
- Unknown Element of Owning Costs—Impact of Residual Value. In: Journal of Construction Engineering and Management, v. 133, n. 1 (Januar 2007). (2007):