-
Johannes, Koos / Voordijk, Hans / Aranda-mena, Guillermo (2022): The role of purchasing in raising the maturity of smart maintenance management. In: Built Environment Project and Asset Management, v. 13, n. 2 (Dezember 2022).
https://doi.org/10.1108/bepam-01-2022-0004
-
Vahdatikhaki, Faridaddin / Barus, Meggie Vincentia / Shen, Qinshuo / Voordijk, Hans / Hammad, Amin (2023): Surrogate modelling of solar radiation potential for the design of PV module layout on entire façade of tall buildings. In: Energy and Buildings, v. 286 (Mai 2023).
https://doi.org/10.1016/j.enbuild.2023.112958
-
Shen, Qinshuo / Vahdatikhaki, Faridaddin / Voordijk, Hans / van der Gucht, Jeffrey / van der Meer, Lex (2022): Metamodel-based generative design of wind turbine foundations. In: Automation in Construction, v. 138 (Juni 2022).
https://doi.org/10.1016/j.autcon.2022.104233
-
Voordijk, Hans / ter Huurne, Ramon / olde Scholtenhuis, Léon (2022): Adoption and Use of Ontologies in the Utility Sector: A Technological Mediation Perspective. In: Journal of Management in Engineering (ASCE), v. 38, n. 1 (Januar 2022).
https://doi.org/10.1061/(asce)me.1943-5479.0000989
-
van Manen, Mechiel / olde Scholtenhuis, Léon / Voordijk, Hans (2021): Empirically validating five propositions regarding 3D visualizations for subsurface utility projects. In: Engineering, Construction and Architectural Management, v. 29, n. 6 (Juni 2021).
https://doi.org/10.1108/ecam-11-2020-0980
-
Voordijk, Hans (2021): Technical mediation and digital technologies in construction practice. In: Architectural Engineering and Design Management, v. 19, n. 2 (Juni 2021).
https://doi.org/10.1080/17452007.2021.1944840
-
van den Berg, Marc / Voordijk, Hans / Adriaanse, Arjen (2021): BIM uses for deconstruction: an activity-theoretical perspective on reorganising end-of-life practices. In: Construction Management and Economics, v. 39, n. 4 (Januar 2021).
https://doi.org/10.1080/01446193.2021.1876894
-
Voordijk, Hans (2011): Construction management research at the interface of design and explanatory science. In: Engineering, Construction and Architectural Management, v. 18, n. 4 (Juli 2011).
https://doi.org/10.1108/09699981111145790
-
Bemelmans, Jeroen / Voordijk, Hans / Vos, Bart (2012): Supplier‐contractor collaboration in the construction industry. A taxonomic approach to the literature of the 2000‐2009 decade. In: Engineering, Construction and Architectural Management, v. 19, n. 4 (Juni 2012).
https://doi.org/10.1108/09699981211237085
-
Plantinga, Henrico / Voordijk, Hans / Dorée, André (2019): The reasoning behind infrastructure manager’s choice of procurement instruments. In: Engineering, Construction and Architectural Management, v. 26, n. 2 (März 2019).
https://doi.org/10.1108/ecam-02-2018-0068
-
Hoezen, Mieke / Voordijk, Hans / Dewulf, Geert (2012): Contracting dynamics in the competitive dialogue procedure. In: Built Environment Project and Asset Management, v. 2, n. 1 (Juli 2012).
https://doi.org/10.1108/20441241211235017
-
Hofman, Erwin / Voordijk, Hans / Halman, Johannes (2009): Matching supply networks to a modular product architecture in the house-building industry. In: Building Research & Information, v. 37, n. 1 ( 2009).
https://doi.org/10.1080/09613210802628003
-
van Duren, Joop / Dorée, André / Voordijk, Hans (2015): Perceptions of success in performance-based procurement. Differences between clients and contractors. In: Construction Innovation, v. 15, n. 1 (Januar 2015).
https://doi.org/10.1108/ci-04-2014-0022
-
Habets, Thijs / Voordijk, Hans / van der Sijde, Peter (2011): The adoption of innovative asphalt equipment in road construction. In: Construction Innovation, v. 11, n. 2 (April 2011).
https://doi.org/10.1108/14714171111124185
-
Adriaanse, Arjen / Voordijk, Hans / Dewulf, Geert (2010): The use of interorganisational ICT in construction projects: a critical perspective. In: Construction Innovation, v. 10, n. 2 (April 2010).
https://doi.org/10.1108/14714171011037200
-
Adriaanse, Arjen / Voordijk, Hans (2005): Interorganizational communication and ICT in construction projects: a review using metatriangulation. In: Construction Innovation, v. 5, n. 3 (September 2005).
https://doi.org/10.1108/14714170510815230
-
Laan, Albertus / Voordijk, Hans / Noorderhaven, Niels / Dewulf, Geert (2012): Levels of Interorganizational Trust in Construction Projects: Empirical Evidence. In: Journal of Construction Engineering and Management, v. 138, n. 7 (Juli 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000495
-
Adriaanse, Arjen / Voordijk, Hans / Dewulf, Geert (2010): Adoption and Use of Interorganizational ICT in a Construction Project. In: Journal of Construction Engineering and Management, v. 136, n. 9 (September 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000201
-
van den Berg, Marc / Voordijk, Hans / Adriaanse, Arjen / Hartmann, Timo (2017): Experiencing Supply Chain Optimizations: A Serious Gaming Approach. In: Journal of Construction Engineering and Management, v. 143, n. 11 (November 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001388
-
Kremers, Jasper / Rietjens, Bas / Voordijk, Hans / De Boer, Sirp J. (2010): Construction contracting and civil–military interaction. In: Construction Management and Economics, v. 28, n. 8 (August 2010).
https://doi.org/10.1080/01446191003762256
-
De Haan, Job / Voordijk, Hans / Joosten, Geert-Jan (2002): Market strategies and core capabilities in the building industry. In: Construction Management and Economics, v. 20, n. 2 (März 2002).
https://doi.org/10.1080/01446190110108662
-
Voordijk, Hans / Adriaanse, Arjen (2015): Engaged scholarship in construction management research: the adoption of information and communications technology in construction projects. In: Construction Management and Economics, v. 34, n. 7-8 (April 2015).
https://doi.org/10.1080/01446193.2016.1139145
-
Hoezen, Mieke / van Rutten, John / Voordijk, Hans / Dewulf, Geert (2010): Towards better customized service‐led contracts through the competitive dialogue procedure. In: Construction Management and Economics, v. 28, n. 11 (November 2010).
https://doi.org/10.1080/01446193.2010.506517
-
Van Reedt Dortland, Maartje / Voordijk, Hans / Dewulf, Geert (2013): Real options in project coalitions in Dutch health care: two case studies of construction projects. In: Construction Management and Economics, v. 31, n. 3 (März 2013).
https://doi.org/10.1080/01446193.2012.738921
-
Voordijk, Hans (2013): Managing Project Supply Chains. In: Construction Management and Economics, v. 31, n. 11 (November 2013).
https://doi.org/10.1080/01446193.2013.829239
-
Snippert, Tim / Witteveen, Wiebe / Boes, Hans / Voordijk, Hans (2014): Barriers to realizing a stewardship relation between client and vendor: the Best Value approach. In: Construction Management and Economics, v. 33, n. 7 (Juli 2014).
https://doi.org/10.1080/01446193.2015.1078902
-
Voordijk, Hans / Van Leuven, Arjen / Laan, Albertus (2003): Enterprise Resource Planning in a large construction firm: implementation analysis. In: Construction Management and Economics, v. 21, n. 5 (Juli 2003).
https://doi.org/10.1080/0144619032000072155
-
Voordijk, Hans (2012): Contemporary Issues in Construction in Developing Countries. In: Construction Management and Economics, v. 30, n. 4 (April 2012).
https://doi.org/10.1080/01446193.2012.665171
-
Voordijk, Hans (2009): Construction management and economics: the epistemology of a multidisciplinary design science. In: Construction Management and Economics, v. 27, n. 8 (August 2009).
https://doi.org/10.1080/01446190903117777
-
Bemelmans, Jeroen / Voordijk, Hans / Vos, Bart / Buter, Jan (2012): Assessing Buyer-Supplier Relationship Management: Multiple Case-Study in the Dutch Construction Industry. In: Journal of Construction Engineering and Management, v. 138, n. 1 (Januar 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000418