Preston D. Vineyard
- (2023): Kosciuszko Bridge Phase 2 – Erecting a Cable Stayed Bridge in a Dense Urban Environment. Vorgetragen bei: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- (2019): Design for Future Transit Rail Maximizes Benefits from Initial Investment for the Gov. Mario M. Cuomo Bridge. Vorgetragen bei: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019.
- (2019): Design of the Governor Mario M. Cuomo Bridge. Vorgetragen bei: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019.
- Under Control. In: Civil Engineering Magazine, v. 83, n. 3 (März 2013). (2013):