-
Grajek, Kenneth M. / Gibson, G. Edward / Tucker, Richard L. (2000): Partnered Project Performance in Texas Department of Transportation. In: Journal of Infrastructure Systems, v. 6, n. 2 (Juni 2000).
https://doi.org/10.1061/(asce)1076-0342(2000)6:2(73)
-
Lee, Sang-Hoon / Thomas, Stephen R. / Macken, Candace L. / Chapman, Robert E. / Tucker, Richard L. / Kim, Inho (2005): Economic Value of Combined Best Practice Use. In: Journal of Management in Engineering (ASCE), v. 21, n. 3 (Juli 2005).
https://doi.org/10.1061/(asce)0742-597x(2005)21:3(118)
-
Anderson, Stuart D. / Tucker, Richard L. (1994): Improving Project Management of Design. In: Journal of Management in Engineering (ASCE), v. 10, n. 4 (Juli 1994).
https://doi.org/10.1061/(asce)9742-597x(1994)10:4(35)
-
Tucker, Richard L. (1986): Management of Construction Productivity. In: Journal of Management in Engineering (ASCE), v. 2, n. 3 (Juli 1986).
https://doi.org/10.1061/(asce)9742-597x(1986)2:3(148)
-
O'Connor, James T. / Tucker, Richard L. (1986): Industrial Project Constructability Improvement. In: Journal of Construction Engineering and Management, v. 112, n. 1 (März 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:1(69)
-
Lemna, Gary J. / Borcherding, John D. / Tucker, Richard L. (1986): Productive Foremen in Industrial Construction. In: Journal of Construction Engineering and Management, v. 112, n. 2 (Juni 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:2(192)
-
O'Connor, James T. / Larimore, Mark A. / Tucker, Richard L. (1986): Collecting Constructability Improvement Ideas. In: Journal of Construction Engineering and Management, v. 112, n. 4 (Dezember 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:4(463)
-
Rogge, David F. / Tucker, Richard L. (1987): Research Needs in Steel and Concrete Construction. In: Journal of Construction Engineering and Management, v. 113, n. 3 (September 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:3(440)
-
Tucker, Richard L. (1988): Perfection of the Buggy Whip. In: Journal of Construction Engineering and Management, v. 114, n. 2 (Juni 1988).
https://doi.org/10.1061/(asce)0733-9364(1988)114:2(158)
-
Glavan, John R. / Tucker, Richard L. (1991): Forecasting Design‐Related Problems—Case Study. In: Journal of Construction Engineering and Management, v. 117, n. 1 (März 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:1(47)
-
Burleson, Rebecca C. / Haas, Carl T. / Tucker, Richard L. / Stanley, Algernon (1998): Multiskilled Labor Utilization Strategies in Construction. In: Journal of Construction Engineering and Management, v. 124, n. 6 (Dezember 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:6(480)
-
Lee, Sang-Hoon / Thomas, Stephen R. / Tucker, Richard L. (2004): Effective Practice Utilization Using Performance Prediction Software. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(576)
-
Thomas, Stephen R. / Lee, Sang-Hoon / Spencer, John D. / Tucker, Richard L. / Chapman, Robert E. (2004): Impacts of Design/Information Technology on Project Outcomes. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(586)
-
Tucker, Richard L. / O'Connor, James T. / Gatton, Thomas M. / Gibson, G. Edward / Haas, Carl T. / Hudson, David N. (1994): The Impact of Computer Technology on Construction's Future. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (Januar 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00357.x
-
Park, Hee-Sung / Thomas, Stephen R. / Tucker, Richard L. (2005): Benchmarking of Construction Productivity. In: Journal of Construction Engineering and Management, v. 131, n. 7 (Juli 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:7(772)
-
Lee, Sang-Hoon / Thomas, Stephen R. / Tucker, Richard L. (2005): Web-Based Benchmarking System for the Construction Industry. In: Journal of Construction Engineering and Management, v. 131, n. 7 (Juli 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:7(790)
-
Castañeda, Jorge A. / Tucker, Richard L. / Haas, Carl T. (2005): Workers' Skills and Receptiveness to Operate Under the Tier II Construction Management Strategy. In: Journal of Construction Engineering and Management, v. 131, n. 7 (Juli 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:7(799)
-
Tucker, Richard L. (2007): Construction Industry Institute. In: Journal of Construction Engineering and Management, v. 133, n. 9 (September 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:9(640)
-
Grimm, Clayford T. / Tucker, Richard L. (1985): Flexural Strength of Masonry Prisms Versus Wall Panels. In: Journal of Structural Engineering (ASCE), v. 111, n. 9 (September 1985).
https://doi.org/10.1061/(asce)0733-9445(1985)111:9(2021)
-
Lee, Sang‐Hoon / Thomas, Stephen R. / Tucker, Richard L. (2005): The relative impacts of selected practices on project cost and schedule. In: Construction Management and Economics, v. 23, n. 5 (Juni 2005).
https://doi.org/10.1080/01446190500040232
-
Laufer, Alexander / Tucker, Richard L. / Shapira, Aviad / Shenhar, Aaron J. (1994): The multiplicity concept in construction project planning. In: Construction Management and Economics, v. 12, n. 1 (Januar 1994).
https://doi.org/10.1080/01446199400000007
-
Thomas, Stephen R. / Tucker, Richard L. / Kelly, William R. (1998): Critical Communications Variables. In: Journal of Construction Engineering and Management, v. 124, n. 1 (Januar 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:1(58)