Semyon Treyger
- The Gerald Desmond Cable-Stayed Bridge - A Case Study in Performance-Based Seismic Design. Vorgetragen bei: Structures Congress 2013, Pittsburgh, Pennsylvania, May 2-4, 2013. :
- Seismic Analysis and Design of the New Tacoma Narrows Suspension Bridge. Vorgetragen bei: IABSE Symposium: Structures and Extreme Events, Lisbon, Portugal, 14-17 September 2005. (2005):
- Retrofit of Yerba Buena Island Tunnel, California, USA. Vorgetragen bei: IABSE Conference: Operation, Maintenance and Rehabilitation of Large Infrastructure Projects, Bridges and Tunnels, Copenhagen, Denkmark, 15-17 May 2006. (2006):
- The People's Bridge. In: Civil Engineering Magazine, v. 86, n. 4 (April 2016). (2016):