Ferdinand Trenkler
- Continuous bridge slides laterally into final position. Vorgetragen bei: IABSE Symposium: Bridges - Interaction between construction technology and design, Leningrad, USSR, 1991. (1991):
- The lifting, transport and placing of the Øresund pylon caissons. Vorgetragen bei: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999. (1999):
- Customized Slide. In: News. The VSL-Intrafor Magazine, v. 12, n. 1 ( 2001). (2001):
- Exchange steam generators at Beznau Nuclear Power Station. In: VSL News, v. 10, n. 1 ( 1999). (1999):
- Lifting the main girders for a new portal crane in Kvaerner shipyard, Philadelphia. In: VSL News, v. 10, n. 2 ( 1999). (1999):
- Spectacular Assembly of the Dreirosen Bridge. In: VSL News, v. 11, n. 1 ( 2000). (2000):
- Giant Roof Structure Lift. In: VSL News, v. 11, n. 2 ( 2000). (2000):
- VSL Heavy Lifting Exchange Steam Generators at Nuclear Power Station. In: VSL News, v. 4, n. 2 ( 1993). (1993):
- Launching of Two Module Support Beams in Norway. In: VSL News, v. 5, n. 2 ( 1994). (1994):
- VSL Incremental Launching of the Lowenberg Viaduct, Switzerland. In: VSL News, v. 3, n. 1 ( 1992). (1992):