Robert L. K. Tiong
- Regeneration diagnosis for the service lifespans of residential buildings on a circular economy perspective. In: Energy and Buildings, v. 319 (September 2024). (2024):
- Physics-informed deep reinforcement learning for enhancement on tunnel boring machine's advance speed and stability. In: Automation in Construction, v. 158 (Februar 2024). (2024):
- Semi-supervised learning-based point cloud network for segmentation of 3D tunnel scenes. In: Automation in Construction, v. 146 (Februar 2023). (2023):
- Public–Private Partnership Contract Failure Prediction Using Example-Dependent Cost-Sensitive Models. In: Journal of Management in Engineering (ASCE), v. 38, n. 1 (Januar 2022). (2022):
- New Model for Identifying Critical Success Factors Influencing BIM Adoption from Precast Concrete Manufacturers’ View. In: Journal of Construction Engineering and Management, v. 146, n. 4 (April 2020). (2020):
- NPV-at-Risk Method in Infrastructure Project Investment Evaluation. In: Journal of Construction Engineering and Management, v. 126, n. 3 (Mai 2000). (2000):
- Strategies in Risk Management of On‐Demand Guarantees. In: Journal of Construction Engineering and Management, v. 118, n. 2 (Juni 1992). (1992):
- Risks and Guarantees in BOT Tender. In: Journal of Construction Engineering and Management, v. 121, n. 2 (Juni 1995). (1995):
- Risk Management Model for International Construction Joint Ventures. In: Journal of Construction Engineering and Management, v. 125, n. 5 (September 1999). (1999):
- Political Risks: Analysis of Key Contract Clauses in China's BOT Project. In: Journal of Construction Engineering and Management, v. 125, n. 3 (Juni 1999). (1999):
- Productivity improvement of precast shop drawings generation through BIM-based process re-engineering. In: Automation in Construction, v. 54 (Juni 2015). (2015):
- Optimal Capital Structure Model for BOT Power Projects in Turkey. In: Journal of Construction Engineering and Management, v. 129, n. 1 (Februar 2003). (2003):
- Risk assessment on contractors' pricing strategies. In: Construction Management and Economics, v. 19, n. 1 (Januar 2001). (2001):
- Tariff adjustment frameworks for privately financed infrastructure projects. In: Construction Management and Economics, v. 21, n. 4 (Juni 2003). (2003):
- Minimum feasible tariff model for BOT water supply projects in Malaysia. In: Construction Management and Economics, v. 23, n. 3 (März 2005). (2005):