Don Theobald
- Design-Build Replacement Bridge for St. George Island Protects the Environment and Ensures Durability. In: PCI Journal, v. 50, n. 6 (November 2005). (2005):
- High Performance Concrete Extends Life of Charenton Canal Bridge. In: PCI Journal, v. 45, n. 4 (Juli 2000). (2000):