Walid Y. Thabet
- SCaRC: Space-Constrained Resource-Constrained Scheduling System. In: Journal of Computing in Civil Engineering, v. 11, n. 1 (Januar 1997). (1997):
- Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings. In: Journal of Construction Engineering and Management, v. 120, n. 1 (März 1994). (1994):
- HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects. In: Journal of Construction Engineering and Management, v. 120, n. 4 (Dezember 1994). (1994):
- A Virtual Construction Environment for preconstruction planning. In: Automation in Construction, v. 12, n. 2 (März 2003). (2003):
- The use of a BIM-based framework to support safe facility management processes. In: Automation in Construction, v. 60 (Dezember 2015). (2015):