S. Teramoto
- 京葉線東京地下駅工事における横須賀線シールドアンダーピニングの自動計測とジャッキ制御 (Automatic Measuring System and Jack Control System for Underpinning Work for Yokosuka Line Shield Tunnel in Construction of Keiyo Line Tokyo Underground Station). In: Concrete Journal (JCI), v. 28, n. 2 ( 1990). (1990):
- The effect of the 'Mini-Bench Cut Method' and 'Container Mucking Methods' on the construction periods and costs of road tunnels. Vorgetragen bei: AFTES - Journées techniques, Toulon , 1993. (1993):