- (2024): BIM- and GIS-Based Life-Cycle-Assessment Framework for Enhancing Eco Efficiency and Sustainability in the Construction Sector. In: Buildings, v. 14, n. 2 (1 Februar 2024).
- Flexible 3D Model Partitioning System for nD-Based BIM Implementation of Alignment-Based Civil Infrastructure. In: Journal of Management in Engineering (ASCE), v. 36, n. 1 (Januar 2020). (2020):
- Controlled blasting in underground construction: A case study of a tunnel plug demolition in the Neelum Jhelum hydroelectric project. In: Tunnelling and Underground Space Technology, v. 93 (November 2019). (2019):
- Damage Prevention for underground utilities using machine guidance. In: Automation in Construction, v. 107 (November 2019). (2019):
- 3d Earthwork BIM Design and Ist Application in an Advanced Construction Equipment Operation. In: Architecture and Engineering, v. 4, n. 2 (Juni 2019). (2019):
- 3D Design Modeling Application in Machine Guidance System for Earthwork Operations. In: KSCE Journal of Civil Engineering, v. 22, n. 12 (November 2018). (2018):