Sandy L. Y. Tang
- Balancing fee and quality in two envelope fee bidding. In: Engineering, Construction and Architectural Management, v. 11, n. 3 (Juni 2004). (2004):
- Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. In: Construction Management and Economics, v. 20, n. 1 (Januar 2002). (2002):