Kevin E. Swiggum
- Case Study of Burlington Cable‐Stayed Bridge. In: Journal of Construction Engineering and Management, v. 120, n. 3 (September 1994). (1994):
- Constructability Related to TQM, Value Engineering, and Cost/Benefits. In: Journal of Performance of Constructed Facilities (ASCE), v. 8, n. 1 (Februar 1994). (1994):