Etsuro Suzuki
- A Study on the Underground Wiring by the Tokyo Municipal Electricity Bureau and a Permission fromthe Communication Ministry. In: Historical Studies in Civil Engineering, v. 22 ( 2002). (2002):
- A Study of Common Ducts Projects for Elimination of Electric Poles on the basis of City Planning. In: Historical Studies in Civil Engineering, v. 21 ( 2001). (2001):
- Status Change of Common Underground Ducts from a Road Occupying Structure to a Fixture to Roads. In: Historical Studies in Civil Engineering, v. 20 ( 2000). (2000):
- Removal of electric poles seen in reconstruction plans in pre-and postwar in TOKYO. In: Historical Studies in Civil Engineering, v. 19 ( 1999). (1999):
- The origin of electric which Tokyo depends on for a peculiar institution of road-occupying constructions in Meiji and Taisho Era. In: Historical Studies in Civil Engineering, v. 18 ( 1998). (1998):
- A study on the utility pipe subway plan of the Reconstruction Program in Tokyo after Kanto Earthquake and the execution. In: Historical Studies in Civil Engineering, v. 17 ( 1997). (1997):