D. P. Stewart
- Centrifuge model testing of tunnelling-induced ground and pile deformations. In: Géotechnique, v. 50, n. 3 (Juni 2000). (2000):
- Design of piled bridge abutments on soft clay for loading from lateral soil movements. In: Géotechnique, v. 44, n. 2 (Juni 1994). (1994):
- Numerical modelling of piled bridge abutments on soft ground. In: Computers and Geotechnics, v. 15, n. 1 (Januar 1993). (1993):
- Kinematic Hardening Model for Pipeline‐Soil Interaction under Various Loading Conditions. In: International Journal of Geomechanics, v. 2, n. 4 (Oktober 2002). (2002):
- Centrifuge Modelling of Piled Bridge Abutments on Soft Ground. In: Soils and Foundations, v. 34, n. 1 (März 1994). (1994):
- Propeller Wash Scour near Quay Walls. In: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 125, n. 4 (Juli 1999). (1999):