M. Smith
- Validation of an automated capacity planning in the concrete building materials industry using an industrial case study. In: Building and Environment, v. 31, n. 2 (März 1996). (1996):
- The Cost of Early Termination of a Contract. In: Proceedings of the Institution of Civil Engineers, v. 74, n. 1 (Februar 1983). (1983):
- Steel and Iron Railway-Bridges in Canada. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 117, n. 1894-3 ( 1894). (1894):
- Enhanced flexible riser installation — extending towed production system technologies. In: Marine Structures, v. 5, n. 5 (Januar 1992). (1992):