Stefan Skuk
- Brenner Base Tunnel: First results of the exploratory tunnels from a geological and geomechanical point of view. In: Geomechanics and Tunnelling, v. 10, n. 3 (Juni 2017). (2017):
- Brenner Base Tunnel - a 10.5 km double shield TBM drive in granite / Brenner Basistunnel - 10,5 km Doppelschild-TBM im Granit. In: Geomechanics and Tunnelling, v. 8, n. 3 ( 2015). (2015):