-
Li, Hongyang / Liu, Mujun / Deng, Yichuan / Ou, Zhibin / Talebian, Nima / Skitmore, Martin / Ge, Ye: Automated Kinect-based posture evaluation method for work-related musculoskeletal disorders of construction workers. In: Journal of Asian Architecture and Building Engineering.
https://doi.org/10.1080/13467581.2024.2357202
-
Azimi, Samaneh / Hon, Carol K. H. / Tyvimaa, Tanja / Skitmore, Martin (2023): Barriers to Energy Efficiency: Low-Income Households in Australia. In: Buildings, v. 13, n. 4 (24 März 2023).
https://doi.org/10.3390/buildings13040954
-
Yap, Jeffrey Boon Hui / Lam, Canwin Guan Ying / Skitmore, Martin / Talebian, Nima (2022): Barriers To The Adoption Of New Safety Technologies In Construction: A Developing Country Context. In: Journal of Civil Engineering and Management, v. 28, n. 2 (14 Januar 2022).
https://doi.org/10.3846/jcem.2022.16014
-
Li, Hongyang / Ng, Shiu Tong Thomas / Skitmore, Martin / Zhang, Xiaoling / Jin, Zhigang (2017): Barriers to building information modelling in the Chinese construction industry. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 170, n. 2 (Juni 2017).
https://doi.org/10.1680/jmuen.16.00059
-
Choy Chia, Fah / Skitmore, Martin / Runeson, Goran / Bridge, Adrian: An analysis of construction productivity in Malaysia. In: Construction Management and Economics.
https://doi.org/10.1080/01446193.2012.711910
-
Yap, Jeffrey Boon Hui / Skitmore, Martin / Lim, Yi Wen / Loo, Siaw-Chuing / Gray, Jason (2021): Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. In: Engineering, Construction and Architectural Management, v. 29, n. 6 (Juni 2021).
https://doi.org/10.1108/ecam-01-2021-0091
-
May, Dayne / Wilson, Owen / Skitmore, Martin (2001): Bid cutting: an empirical study of practice in South‐East Queensland. In: Engineering, Construction and Architectural Management, v. 8, n. 4 (April 2001).
https://doi.org/10.1108/eb021186
-
Skitmore, Martin / Drew, Derek (2003): The analysis of pre‐tender building price forecasting performance: a case study. In: Engineering, Construction and Architectural Management, v. 10, n. 1 (Februar 2003).
https://doi.org/10.1108/09699980310466532
-
Mills, Anthony / Harris, David / Skitmore, Martin (2003): The accuracy of housing forecasting in Australia. In: Engineering, Construction and Architectural Management, v. 10, n. 4 (August 2003).
https://doi.org/10.1108/09699980310489951
-
Li, Heng / Chan, Greg / Skitmore, Martin / Huang, Ting (2015): A 4D automatic simulation tool for construction resource planning: a case study. In: Engineering, Construction and Architectural Management, v. 22, n. 5 (September 2015).
https://doi.org/10.1108/ecam-07-2014-0093
-
Cheung, Franco K. T. / Skitmore, Martin (2006): Application of cross validation techniques for modelling construction costs during the very early design stage. In: Building and Environment, v. 41, n. 12 (Dezember 2006).
https://doi.org/10.1016/j.buildenv.2005.09.011
-
Xie, Linlin / Hu, Yi / Zhang, Bing / Xia, Bo / Skitmore, Martin / Gao, Xianyi (2019): Accountability Effects of Public Participation Practice in Chinese Public Projects: Partial Least-Squares Path Analysis. In: Journal of Management in Engineering (ASCE), v. 35, n. 6 (November 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000716
-
Ye, Gui / Jin, Zhigang / Xia, Bo / Skitmore, Martin (2015): Analyzing Causes for Reworks in Construction Projects in China. In: Journal of Management in Engineering (ASCE), v. 31, n. 6 (November 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000347
-
Yu, Yantao / Li, Heng / Umer, Waleed / Dong, Chao / Yang, Xincong / Skitmore, Martin / Wong, Arnold Y. L. (2019): Automatic Biomechanical Workload Estimation for Construction Workers by Computer Vision and Smart Insoles. In: Journal of Computing in Civil Engineering, v. 33, n. 3 (Mai 2019).
https://doi.org/10.1061/(asce)cp.1943-5487.0000827
-
Skitmore, Martin / Drew, Derek / Ngai, Stephen (2001): Bid-Spread. In: Journal of Construction Engineering and Management, v. 127, n. 2 (April 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:2(149)
-
Zhao, Zhen-yu / Tang, Chao / Zhang, Xiaoling / Skitmore, Martin (2017): Agglomeration and Competitive Position of Contractors in the International Construction Sector. In: Journal of Construction Engineering and Management, v. 143, n. 6 (Juni 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001284
-
Hu, Xin / Xia, Bo / Skitmore, Martin / Chen, Qing (2016): The application of case-based reasoning in construction management research: An overview. In: Automation in Construction, v. 72 (Dezember 2016).
https://doi.org/10.1016/j.autcon.2016.08.023
-
Li, Heng / Yang, Xincong / Skitmore, Martin / Wang, Fenglai / Forsythe, Perry (2017): Automated classification of construction site hazard zones by crowd-sourced integrated density maps. In: Automation in Construction, v. 81 (September 2017).
https://doi.org/10.1016/j.autcon.2017.04.007
-
Skitmore, Martin / Thomas Ng, S. (2002): Analytical and Approximate Variance of Total Project Cost. In: Journal of Construction Engineering and Management, v. 128, n. 5 (Oktober 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:5(456)
-
Wong, E. S. / Then, Danny / Skitmore, Martin (2000): Antecedents of trust in intra-organizational relationships within three Singapore public sector construction project management agencies. In: Construction Management and Economics, v. 18, n. 7 (Oktober 2000).
https://doi.org/10.1080/014461900433087
-
Skitmore, Martin / Runeson, Goran (2006): Bidding models: testing the stationarity assumption. In: Construction Management and Economics, v. 24, n. 8 (August 2006).
https://doi.org/10.1080/01446190600680432
-
Skitmore, Martin / Ng, Thomas (2001): Australian project time‐cost analysis: Statistical analysis of intertemporal trends. In: Construction Management and Economics, v. 19, n. 5 (September 2001).
https://doi.org/10.1080/01446193.2001.10383089
-
Skitmore, Martin / Thomas, Ng (2001): Australian project time‐cost analysis: Statistical analysis of intertemporal trends. In: Construction Management and Economics, v. 19, n. 5 (September 2001).
https://doi.org/10.1080/01446193.2001.9709621
-
Drew, Derek S. / Ho, Liwina C. Y. / Skitmore, Martin (2001): Analysing a consultant's competitiveness in two‐envelope fee tendering. In: Construction Management and Economics, v. 19, n. 5 (September 2001).
https://doi.org/10.1080/01446193.2001.9709626
-
Drew, Derek S. / Ho, Liwina C. Y. / Skitmore, Martin (2001): Analysing a consultant's competitiveness in two‐envelope fee tendering. In: Construction Management and Economics, v. 19, n. 5 (September 2001).
https://doi.org/10.1080/01446193.2001.10383094
-
Drew, Derek S. / Ho, Liwina C. Y. / Skitmore, Martin (2001): Analysing a consultant's competitiveness in two-envelope fee tendering. In: Construction Management and Economics, v. 19, n. 5 (September 2001).
https://doi.org/10.1080/01446190110045770
-
Skitmore, Martin / Ng, Thomas (2001): Australian project time–cost analysis: statistical analysis of intertemporal trends. In: Construction Management and Economics, v. 19, n. 5 (September 2001).
https://doi.org/10.1080/01446190110046896
-
Ballesteros-Pérez, Pablo / González-Cruz, M. Carmen / Fuentes-Bargues, Jose Luis / Skitmore, Martin (2014): Analysis of the distribution of the number of bidders in construction contract auctions. In: Construction Management and Economics, v. 33, n. 9 (September 2014).
https://doi.org/10.1080/01446193.2015.1090008
-
Siu, Gladys Kim Wan / Bridge, Adrian / Skitmore, Martin (2001): Assessing the service quality of building maintenance providers: mechanical and engineering services. In: Construction Management and Economics, v. 19, n. 7 (November 2001).
https://doi.org/10.1080/01446190110062104
-
Hatush, Zedan / Skitmore, Martin (1997): Assessment and evaluation of contractor data against client goals using PERT approach. In: Construction Management and Economics, v. 15, n. 4 (Juli 1997).
https://doi.org/10.1080/014461997372881