Mirosław Skibniewski
- GPS-Based Real-Time Guidance Information System for Marine Pier Construction. In: Journal of Surveying Engineering (ASCE), v. 139, n. 2 (Mai 2013). (2013):
- An It Model of A Knowledge Map Which Supports Management in Small and Medium-sized Companies Using Selected Polish Construction Enterprises As an Example. In: Journal of Civil Engineering and Management, v. 21, n. 8 (November 2015). (2015):
- Integrated Agent-based Construction Equipment Management: Conceptual Design. In: Journal of Civil Engineering and Management, v. 12, n. 3 (September 2006). (2006):
- Constructability Analysis: Machine Learning Approach. In: Journal of Computing in Civil Engineering, v. 11, n. 1 (Januar 1997). (1997):
- Engineering Decision Support of Automated Shield Tunneling. In: Journal of Construction Engineering and Management, v. 117, n. 4 (Dezember 1991). (1991):
- A framework for developing a unified B2B e-trading construction marketplace. In: Automation in Construction, v. 12, n. 2 (März 2003). (2003):
- Enabling information sharing between E-commerce systems for construction material procurement. In: Automation in Construction, v. 13, n. 2 (März 2004). (2004):
- The Web-based real time bridge scour monitoring system for disaster management. In: The Baltic Journal of Road and Bridge Engineering, v. 9, n. 1 (März 2014). (2014):