Elnaz Siami-Irdemoosa
- Work breakdown structure (WBS) development for underground construction. In: Automation in Construction, v. 58 (Oktober 2015). (2015):
- Maximum surface settlement based classification of shallow tunnels in soft ground. In: Tunnelling and Underground Space Technology, v. 49 (Juni 2015). (2015):