Biao Shu
- Improved Probabilistic Kinematic Analysis Procedure Based on Finite Size Discontinuities and Its Application to a Rock Slope at Open Pit Mine in U.S.. In: International Journal of Geomechanics, v. 17, n. 2 (Februar 2017). (2017):
- Cuttings transport in maxi HDD boreholes with front reaming and one way drilling mud return technologies. In: Tunnelling and Underground Space Technology, v. 72 (Februar 2018). (2018):
- Estimation of the maximum allowable drilling mud pressure for a horizontal directional drilling borehole in fractured rock mass. In: Tunnelling and Underground Space Technology, v. 72 (Februar 2018). (2018):
- return of drilling fluid in large diameter horizontal directional drilling boreholes. In: Tunnelling and Underground Space Technology, v. 52 (Februar 2016). (2016):
- Prediction of rotational torque and design of reaming program using horizontal directional drilling in rock strata. In: Tunnelling and Underground Space Technology, v. 26, n. 2 (März 2011). (2011):