L. J. Shen
- Constraint-Based Planning with Integrated Production Scheduler over Internet. In: Journal of Construction Engineering and Management, v. 129, n. 3 (Juni 2003). (2003):
- Key Constraints Analysis with Integrated Production Scheduler. In: Journal of Construction Engineering and Management, v. 131, n. 7 (Juli 2005). (2005):