Aydin Shaterpour-Mamaghani
- Suggestion of new models for predicting performance of raise boring machines based on indentation tests. In: Tunnelling and Underground Space Technology, v. 138 (August 2023). (2023):
- Full-Scale linear cutting tests using a button cutter and deterministic performance prediction modeling for raise boring machines. In: Tunnelling and Underground Space Technology, v. 127 (September 2022). (2022):
- Development of new empirical models for performance estimation of a raise boring machine. In: Tunnelling and Underground Space Technology, v. 82 (Dezember 2018). (2018):
- Some contributions on the estimation of performance and operational parameters of raise borers – A case study in Kure Copper Mine, Turkey. In: Tunnelling and Underground Space Technology, v. 54 (April 2016). (2016):